![](https://commercialobserver.com/wp-content/uploads/sites/3/2024/01/CO-Ascent-Image.png?w=750&h=480&crop=1)
Material costs fluctuate and land prices rise with market demand—which means that time is the one variable that developers can leverage to cut project costs. Prefabricated mass timber systems are enabling development teams to streamline project delivery and erect buildings in less time with smaller crews—and in turn, to realize cost savings and deliver added value. Delve into the data (and two new case studies) to learn how design teams can use mass timber to improve speed of construction while boosting marketability with the warmth of wood.